55%
Repeat Rate
Best-in-Class Client Retention
Our client repeat rate exceeds 55%. Whether you're a seasoned exhibitor or gearing up for your first event, you can count on our top-tier service to help you stand out on the floor.
Have a question? Contact us

Formulate® Master Hanging Banner Sign · 10′ × 4′ S-Curve

Formulate® Master Hanging Banner Sign · 10′ × 4′ S-Curve

Package includes:

  • (1) Formulate® Master S-Curve Frame Hardware, Connectors, and Cabling Kit
  • (1) 128.7"w x 48"h Pillowcase Fabric Graphic (printed with your artwork)
  • (1) Carry Bag
  • (1) Safety Certificate
  • Setup Instructions

SKU:OB-SSB-1004-G

Regular price $1,079
Regular price $0 Sale price $1,079
Save Sold out
Guaranteed Lowest Price – Shop Confidently.
View full details
Back

Be seen from everywhere.

A wavey hanging banner measuring 10′ diameter by 4′ height, offering 360° visibility for your graphics and messaging from anywhere on the event floor.

Hardware

The hanging structures are constructed from a carefully crafted aluminum tube framework to create a rigid skeleton. All hardware is certified and guaranteed by a licensed structural engineer for use in most tradeshow and convention halls — certificate available upon request.

Graphics

The high-quality, dye-sublimated 5 oz. Soft Knit fabric graphic is stretched over the structure like a pillowcase to form a perfectly smooth look.

Assembly

The hardware is easily assembled using a simple, snap-button assembly system. Detailed, easy-to-follow setup instructions are included. NB: Tradeshow hall or event rigging labor may be required according to specific venue regulations.

Graphic options:

  • One-sided graphic, white fabric backer.
  • Double-sided graphic.

This package includes:

  • Frame
  • Hanging cables
  • Printed graphics (in your selected option)
  • Carry bag and heavy-duty shipping box
  • Step-by-step instructions
Size: 10′w × 4′h
Graphic Material: 5oz Soft Knit
Lead Time: 5 Days (rush options)
Hardware Warranty: Lifetime

Preparing & Submitting Artwork

Prepare the artwork according to these documents:

Submit the print-ready artwork to:

Need a graphic designer? We know some great ones, just contact us.

Additional Notes…

  • Freight cost is calculated upon order confirmation and is the responsibility of the purchaser. To request a shipping cost estimate please contact us.
  • The metal hardware is 100% recyclable.
  • Graphic can be dry-cleaned.
  • Lead time indicates production days and does not include time in transit. Rush shipping options may be available.
Back
Back
  • Processing Time: Orders placed after 12:00 PM PST are processed the next business day. Orders are not processed on weekends or U.S. holidays.
  • Shipping Timeline:
    • Non-custom, in-stock items: Shipped within 3 business days of payment confirmation (unless otherwise requested).
    • Printed graphics: Allow an additional 5 to 15 business days, as noted in each item’s description.
  • Restrictions:
    • We currently do not ship to military addresses or P.O. Boxes.
    • International orders may be subject to customs, duties, taxes, and brokerage fees, which are the buyer's responsibility.

We offer rush shipping on most items - please contact us for a quote.

Artwork Submission Process

Step 1: Place Your Order

After placing your order, you’ll receive all the necessary artwork preparation documents if they’re not already available on the product page.

Step 2: Create Your Artwork

Prepare your artwork based on the specifications in the provided documents. For advice or technical support, don’t hesitate to reach out—we’re here to help! Need graphic design assistance? We can connect you with a professional designer.

Step 3: Upload Your Artwork

There are two ways to submit your print-ready files:

Important: Include your order number and contact details when uploading artwork files, as submissions without this information may not be processed.

Step 4: Approve Your Proof

Within 1 to 3 business days, you’ll receive proof images via email. Please review and reply with your approval.

Note: Production lead times begin only after we receive your proof approval and confirm payment.

Artwork Turnaround Time

For estimated printing times, please contact us. On average, most displays require 5 to 10 business days for printing from the date of proof approval. This timeframe does not include shipping.

Rush Shipping and Printing

Need your order sooner? Contact us to discuss rush options for faster shipping and printing.

 

Formulate® Hanging Structures & Architecture Catalog (PDF)

Formulate® Hanging Structures & Architecture Catalog (PDF)

Click to view the complete Formulate® Hanging Structures & Architecture catalog.